Back to all locations

Location 07

Bergman

Elena Caragiani x Borșa

Full treatment Permitted
Concept visualisation of a safer school street, used illustratively for Bergman.
Generated concept visualisation

What happens here

Location receiving the full treatment, per the permitted technical design:

  • Raised pedestrian crossing
  • Dedicated crossing lighting
  • Hybrid solar power supply
  • CCTV cameras
  • Active signage panels
  • Tactile paving
  • Storm drainage

Surveillance systems are signposted in accordance with applicable law.

Value incl. VAT
The amount for this location is being confirmed with the lead designer and will be published later.
Phase
Permitted — verified technical design, building permit issued
Source
10.7 Memoriu Tehnic General - 07 Elena Caragiani x Borsa (Bergman).pdf

Indicative illustration

Before and after comparison. Use arrow keys to compare.

Designed situation at Elena Caragiani x Borșa (Bergman): the road-safety interventions from the permitted technical design; project drawing pending.
Existing situation at Elena Caragiani x Borșa (Bergman): the street before the intervention; site photo pending.
Before After

Images are illustrative and are intended to support understanding of the proposed interventions. The final form results from the drawings of the permitted technical design.

KEEP EXPLORING

Other locations in the same area or with a similar intervention type.

06
Băneasa neighbourhood

Școala Mea

Văliug

Full treatment Permitted

640,116 RON

View details
08
Băneasa neighbourhood

Grădinița 122

Neagoe Vodă x Băneasa

Full treatment Permitted

1,280,840 RON

View details
09
Băneasa neighbourhood

Kids Club

Grațioasa x Neagoe Vodă

Full treatment Permitted

Amount being confirmed

View details